Sichuan Yitong steel structure in meishan west medicine valley factory construction site

Sichuan Yitong steel structure in meishan west medicine valley factory construction site

2020-04-01 15:52:53

      Now many factories choose to use it in order to save time and expand spaceThe steel structureInstead of the traditional brick-concrete structure, steel structure engineering has been widely used in the engineering field for its advantages of fast construction speed, short cycle, high strength, easy prefabrication, installation, suitable for high-rise large span, etc。In the past, a large number of reinforced concrete structures and prestressed concrete structures were used in Our country, and the on-site engineers and technicians lacked the construction experience of steel structure engineering. The quality of construction directly affected the safety of engineering structure。Therefore, more and more attention has been paid to the quality of steel structure engineering, so it is of great practical significance and necessity to strengthen the quality control of steel structure engineering construction。

Sichuan Yitong steel structure in meishan west medicine valley factory construction site

    The above picture is the construction site of sichuan Yitong Steel Structure in western Meishan Yaogu factory. The construction period is expected to last for 10 days。The whole process is safe and environmentally friendly, which will not affect the normal production of other workshops in the factory。